Free written estimates · Serving Shreveport, Bossier City & Caddo Parish

Stonewall, LA · DeSoto Parish

Drywall Taping & Finishing in Stonewall, LA

Finishing an addition onto a house that has not stopped moving needs the junction detailed for it.

Free Quote in Stonewall

Tell us what you need. We respond within 2 business hours.

* Required. Everything else is optional and helps us quote accurately. Or call (318) 666-5548.

Drywall Finishing for Stonewall Homes

Finishing work in Stonewall almost always sits on top of new construction or a new addition, and that brings a specific consideration that older housing does not.

Stonewall is one of the fastest growing communities in DeSoto Parish, with roughly 14 approved subdivisions representing on the order of 850 homes expected by 2027, and families moving in for the North DeSoto schools then outgrowing their houses. A large share of finishing work here is therefore on additions tied into homes that are themselves only a few years old.

The complication is that a young house has not finished settling and its framing has not finished drying to indoor moisture content. Finishing is what makes a wall rigid and continuous, and running a continuous finished surface across the junction between an old structure that is still moving and a new one that is not concentrates every bit of that movement into a single line. That line is exactly where a crack is most visible and most irritating. The junction has to be detailed to accommodate movement rather than finished as though the two structures were one, and where a house is genuinely very new we will sometimes recommend timing the work rather than fighting it.

Beyond that, the finish level question applies as it does in any new build, and it is worth deciding rather than defaulting. Level 4 is correct under flat paint in a normally lit room and is what volume construction assumes. Level 5 earns its cost in rooms with satin or semi-gloss paint, dark colours, or strong side light. In a Stonewall addition that is frequently the point of the addition: a bright family room with large windows, which is precisely the room where Level 4 will show its joints in the afternoon.

Humidity governs the schedule here as everywhere, and coats get scheduled on drying rather than on the calendar.

What's Included

Junction between new and existing work detailed for a house still settling, finish level specified per room against paint and lighting, three coats with dry time judged on conditions, and raking-light inspection before handover.

See full details on our Drywall Taping & Finishing page →

Why Stonewall Homeowners Choose Us

Finishing across the junction between a settling house and a rigid new addition concentrates movement into one visible line. We detail that joint for it, and if the house is too new we say so before you commit.

Beyond that, what you get in Stonewall is what you get anywhere we work: a free written quote that names the finish level before we start, texture tested on a sample board against your own wall rather than guessed at, and a straight answer when the real problem is not drywall at all.

Drywall Taping & Finishing in Stonewall? Get a Free Written Quote.

Finishing an addition in Stonewall? Tell us the age of the existing house, because how new it is changes how we detail the junction.

Or call (318) 666-5548.

Request Your Quote

A little detail helps us quote accurately.

* Required. Everything else is optional and helps us quote accurately. Or call (318) 666-5548.

FAQ

Taping & Finishing Questions from Stonewall

Will the join between my addition and house crack?

It can, and it is the main thing to design around in a young Stonewall home. Finishing makes a wall continuous, so running a finished surface across the junction between a settling structure and a rigid new one puts all that movement into a single visible line. We detail the joint to accommodate it.

What finish level should my new family room have?

If it has large windows or you are using satin paint, Level 5 is worth it in that room. Bright rooms with big windows are exactly where a Level 4 finish will show joint patterns under afternoon light. Elsewhere in the addition, Level 4 under flat paint is correct.

How long does finishing take?

Three to five days for a typical room, most of which is drying rather than working. Compound cures by releasing water into the air and our humidity slows that. Rushing coats is the most common cause of cracking and banding months later, so we schedule on conditions.

Ready to get started in Stonewall?

Free written estimate, itemized before anything begins. We respond within 2 business hours.

Get a Free Quote

or call (318) 666-5548